Ōhaupō job done

The new look road through Ōhaupō.

A six week project to rebuild part of the road through Ōhaupō has been completed.

Ōhaupō

The work involved a 520-metre-long structural asphalt road rebuild and the New Zealand Transport Agency said it was extensive and complicated.

Workers dug down 450mm to remove the existing road surface and built it back up layer by layer to achieve a smooth asphalt road surface.

It was found that the underlying ground strength was poor, so the new road was reconstructed using four layers of asphalt to build it back up to the original height.

The work was part of the government’s $2.07 billion investment into road and drainage renewal and maintenance across 2024-27 via the State Highway Pothole Prevention fund.

Meanwhile at Rukuhia a road rebuild is expected to be completed late this month Rukuhia Road and Narrows Road. A southbound detour is in place for light vehicles via Raynes Road and Airport Road. Rukuhia Road remain open at all times but will only be left in and left out.

The new look road through Ōhaupō.

More Recent News

Make your News our News

News contributions: At Good Local Media we can’t always be at your event or assign a reporter to do interviews – but you can still get your story in the Cambridge News, Te Awamutu News…

A water milestone

It had all the makings of a school reunion. Familiar faces, shared histories and a few laughs about how much things had changed were as much a part of the day as the speeches and…

From varroa to Norroa

A new “gene silencing” product which prevents the varroa bee mite reproducing is likely to become part of New Zealand’s pest control arsenal. Read more

Closing the nutrient loop

Behind the scenes at Fonterra’s Hautapu site, a less visible operation is helping reduce waste and return nutrients to land. Dairy Fert, part of the co-operative, manages byproducts generated during manufacturing and redistributes them to…